Conversation
supportHi, Do you have any timeframe for when it will be possible to change order of the cycle? If this will take some time, is it possible to change, so that the newest picture added will show first? if not, I will have to delete all picutes and add again to get the correct order. Regards, Stian Torland http://challenge4you.com https://wordpress.org/plugins/wp-cycle/
You will need to reload the images.
Any time frame when this option will be added??? The plug in is great EXCEPT that it’s a lot of work to add a new slide that needs to go to the top as stated above. We need a simple way to re-order the slides.
You will need to reload the images.
Any time frame when this option will be added??? The plug in is great EXCEPT that it’s a lot of work to add a new slide that needs to go to the top as stated above. We need a simple way to re-order the slides.